LIVEIndustrial supply network
B2B · PRODUCT SERIES · MERIDIAN LABORATORYREF · IMB · MERIDIAN LABORATORY · ROTOCON-FORJ-INTEGRATION
LIVE
Meridian Laboratory · PRODUCT SERIES
Meridian Laboratory ROTOCON FORJ Integration Series
Fiber Optic + Electrical Slip Ring combinations
ROTOCON FORJ Integration Series combines a Fiber Optic Rotary Joint (FORJ) with an electrical slip ring in a single integrated housing. Ideal when high-bandwidth sensor, camera or data links must cross a rotating axis – used in aerospace, defense, subsea ROV/AUV systems and high-speed imaging.
01
ROTOCON FORJ Integration Series Series Contactor Models
Sorted by current rating (150A → 1000A)
4 MODELS
| MODEL↑ current | Max. Speed (rpm) | model | wavelength | applications | fiber channels | electrical channels |
|---|---|---|---|---|---|---|
| 5000 | FORJ-1F + M | 850 / 1310 / 1550 nm | Single fiber + power on radar / sensor turrets | 1 (SM/MM) | 6–24 | |
| 3000 | FORJ-2F + MXT | 1310 / 1550 nm | Bi-directional data + power on imaging gimbals | 2 (SM) | 8–32 | |
| 2000 | FORJ-4F + MXV | 850–1550 nm | High-bandwidth optical + HV power on test stands | 4 (SM/MM mix) | 4–12 HV | |
| Project-specific | FORJ-CUSTOM | Customer-defined | Engineered hybrid fiber + electrical for ROVs, AUVs, satcom | 1–12 | Project-specific |
FREQUENTLY ASKED QUESTIONS
About the ROTOCON-FORJ-INTEGRATION series
06/06
RELATED INSIGHTS · ROTOCON-FORJ-INTEGRATIONREF · IMB · PUB · 04 ENTRIES
LIVE
RELATED INSIGHTS
Go deeper
- SOON
ROTOCON-FORJ-INTEGRATION Series Selection Guide
A practical approach to selecting the right model family by evaluating voltage, current, coil, mounting and environmental conditions together.In progress - SOON
ROTOCON-FORJ-INTEGRATION Datasheet Checklist
The key technical rows and application limits to verify before quotation or engineering approval.In progress - SOON
ROTOCON-FORJ-INTEGRATION Application Notes
Notes focused on thermal limits, switching duty, protection coordination and mounting conditions for field reliability.In progress - SOON
ROTOCON-FORJ-INTEGRATION RFQ Preparation
How to clarify part number, quantity, application and technical requirements to get accurate pricing and lead time.In progress
// end of index · 04 / 04
